Category: 2013 Renovation
-
ATG – Renovation 17 – A New Floor and BoeingBoeing 3
SCI Flooring is finished installing the tile in the Clubroom, Back Hallway, and Kitchen. We are asking that people stay out of those areas until Monday, December 9 to allow the tile to set up. SCI also finished installing carpeting in the handicapped areas of the auditorium. The Clubroom floor – retiled. The camera didn’t…
-
ATG – Renovation 16 – The Tile’s Going Down
Crews from SCI Flooring are installing tile in the Clubroom, Back Hallway, and Kitchen at The Players Guild of Dearborn. The installation is part of a renovation project that included rebuilding the floor in the Clubroom to prevent additional settling. Guild members are asked not to go into the Clubroom, the Back Hallway, or the…
-
ATG – Renovation 15 – Tile Time
Yesterday, December 2, a small crew of members emptied the Clubroom, the kitchen, and the back hallway of furniture in preparation for the installation of the floor tile. Dave Wood and Pat Denyer worked during the day to move the stove, dishwasher, and refrigerator out of the kitchen. Dave and Pat also moved the rolling…
-
ATG – Final Weekend of The Fantasticks
This is the final weekend for the Players Guild of Dearborn production of the Harvey Schmidt and Tom Jones long-running musical The Fantasticks. There have been six performance to date, all received with enthusiasm. Songs in the show include Try to Remember, Soon It’s Gonna Rain, Plant a Radish, Never Say No, Metaphor, They Were…
-
ATG – An Exciting Two Weeks
The past two weeks have been an exciting time at The Players Guild of Dearborn. We put the “finishing touches” on the summer’s renovation activities. Touch up the paint job. Clean everything. Dust everything. Vacuum everything. Put up the last pieces of chair rail. Install the last pieces of moulding. Clean everything. Dust everything. Vacuum…
-
ATG – Renovation 14 – Clean-up Weekend
IT’S CLEAN-UP WEEKEND! Today – Sept 5 at 7:00pm Tomorrow – Sept 6 – 9:00am – all day Tomorrow – Sept 6 – at 7:00pm Saturday – Sept 7 – 9:00am – all day – lunch provided Sunday – Sept 8 – 11:00am See Below for Committee Assignments Please Join Us!! Help is Needed!! Casting…
-
ATG – Renovation 13 – The Installation of the New Seats
Yesterday, August 27, installers for the Irwin Seating Company out of Grand Rapids, Michigan, installed the new seats at the Players Guild of Dearborn. The six man crew worked for approximately twelve hours to install the 244 seats. The seats arrived in a semi-trailer and were loaded into the Guild via the loading dock…
-
ATG – Renovation 12 – Many Hands …
We had a pretty good turnout on Saturday, August 24. A lot of things got done. In the Clubroom, trim painting was started. You can see the contrasting colors in the picture. The trim around the kitchen window was white. Now the trim is a deep reddish brown. Very classy. That same color scheme will…
-
ATG – Renovation 11 – The Home Stretch
We’re going to do this, people. The photos show that were pretty much “on schedule” to complete the renovation to the point that our season opener, The Fantasticks, can be presented at The Guild. One photo shows the Clubroom all primed for the final painting. Dave Wood is applying the first coat of new paint to the…
-
ATG – Renovation 10 – New Floors
Renovation work is progressing at the Players Guild of Dearborn. The photo above shows the new concrete floor in the Clubroom. The floor was poured yesterday, August 12, and will need several days to dry. The outside ramp was poured today. Please, no handprints, initials, etc. The photo below shows the equipment being used to smooth the floor…